For More Inquiry -7678190783

Mahindra XEV 9e: 528km Round Trip from Manesar to Fatehpur in 96% SoC

Completed Mahindra XEV 9e 1 Travelers
https://evelectree.com/ev-road-trips/18/mahindra-xev-9e-manesar-to-fatehpur-round-trip View All Trips
car

Explore Anuj Purohit's electric vehicle odyssey from Manesar, Haryana to Fatehpur, Rajasthan in their Mahindra XEV 9e on 11th September 2025. This 528-kilometer trip includes 2 charging stops taking total of 0h 30m, costing ₹577 with an efficiency of 7.6 km/kWh. %SoC remaining at the end of the trip was 36%.

Total Distance

528 km

Total Driving Time

8h 58m

Charging Summary
  • 🔌 Charging Stop 2 times
  • ⏱ Total Time 0h 30m
  • 💰 Total Cost ₹577.00
Efficiency

7.6 km/kWh

Final SoC

36%

Main Summary

EV Model:
Mahindra XEV 9e
Variant:
Mahindra XEV 9e Pack 3
Start Location:
Manesar, Haryana
Destination:
Fatehpur, Rajasthan
Battery Capacity:
79 kWh
Start SoC:
98%
Travelers:
1
Boot Load:
Nil
Odometer:
12934 km
Temperature:
30°C
Departure:
6:06 AM, September 11, 2025
Photos:
Pit Stop Photo
Advertisement

Pit Summary

Location:
Shri Ridhi Sidhi Restaurant & Hotel
Arrival Time:
9:46 AM, September 11, 2025
Arrival SoC:
59%
Kilometers Driven:
219 km
Time Driven:
3h 40m
Average Speed:
60 kmph
Driving Mode:
Default
AC Used:
Yes (30°C)
Current Ambient Temperature:
25°C
Regen Braking Level:
Auto regen
Charged Here:
Yes
Parameter Value
Brand Xobolt
Total Connectors 2
Charger Power 60 kW
Output Power 60 kW
Charging Time 00 Hour 18 Min
New Soc 80%
Unit Price ₹20
Total Cost ₹400
Departure Time:
10:08 AM, September 11, 2025
Total Pit Stop Time:
0h 22m
Pit Stop Photos:
Pit Stop Photo
Pit Stop Photo

Location:
Fathehpur
Arrival Time:
11:30 AM, September 11, 2025
Arrival SoC:
65%
Kilometers Driven:
75 km
Time Driven:
1h 22m
Average Speed:
65 kmph
Driving Mode:
DEFAULT,POWERSAVING
AC Used:
Yes (25°C)
Current Ambient Temperature:
35°C
Regen Braking Level:
Auto
Departure Time:
1:34 PM, September 11, 2025
Total Pit Stop Time:
2h 4m
Pit Stop Photos:
Pit Stop Photo

Location:
Jhunjhunu, Rajasthan
Arrival Time:
2:55 PM, September 11, 2025
Arrival SoC:
52%
Kilometers Driven:
85 km
Time Driven:
1h 21m
Average Speed:
60 kmph
Driving Mode:
Default
AC Used:
Yes (25°C)
Current Ambient Temperature:
35°C
Regen Braking Level:
Auto
Charged Here:
Yes
Parameter Value
Brand Indian Oil
Total Connectors 2
Charger Power 60 kW
Output Power 60 kW
Charging Time 00 Hour 12 Min
New Soc 65%
Unit Price ₹14
Total Cost ₹177
Departure Time:
3:18 PM, September 11, 2025
Total Pit Stop Time:
0h 23m
Brief Description:
Good experience on Indian Oil station. I wish all pumps were so accessible in terms of EV charging. Only single gun was connected, so I was able to extract full 60 kW.
Pit Stop Photos:
Pit Stop Photo
Pit Stop Photo
Pit Stop Photo

Destination

Final City:
Manesar, Gurugram, Haryana
Arrival Time:
5:53 PM, September 11, 2025
Arrival SoC:
36%
Odometer Reading:
13462 km
Kilometers Driven:
166 km
Time Driven:
2h 35m
Average Speed:
65 kmph
Driving Mode:
Default
Ambient Temperature:
35°C
AC Used:
Yes (26°C)
Regen Braking Level:
Auto
Additional Photos:
Pit Stop Photo
View on Map View All Trips