Experience the electric journey of Anuj Purohit driving 736 kilometers from Gurugram, Haryana to Sikar & Jaipur, Rajasthan in their Mahindra XEV 9e on 11th December 2025. With 2 charging stops taking total of 0h 51m and ₹1052 in charging expenses, this trip highlights an efficiency of 7.6 km/kWh. %SoC remaining at the end of the trip was 19%.
736 km
16h 43m
7.6 km/kWh
19%
| Parameter | Value |
|---|---|
| Brand | Xobolt |
| Total Connectors | 2 |
| Charger Power | 60 kW |
| Output Power | 60 kW |
| Charging Time | 00 Hour 30 Min |
| New Soc | 94% |
| Unit Price | ₹19.95 |
| Total Cost | ₹652 |
| Parameter | Value |
|---|---|
| Brand | Xobolt |
| Total Connectors | 2 |
| Charger Power | 60 kW |
| Output Power | 45 kW |
| Charging Time | 00 Hour 21 Min |
| New Soc | 83% |
| Unit Price | ₹19.45 |
| Total Cost | ₹400 |