For More Inquiry -7678190783

Mahindra XEV 9e: 556km Trip from Gurugram to McLeod Ganj, Himachal Pradesh in 97% SoC

Completed Mahindra XEV 9e 1 Travelers
https://evelectree.com/ev-road-trips/24/mahindra-xev-9e-gurugram-to-mcleod-ganj-556km View All Trips
car

Discover Anuj Purohit's eco-friendly adventure in their Mahindra XEV 9e, traveling 556 kilometers from Manesar, Gurugram, Haryana to Dharamshala, Himachal Pradesh on 21st September 2025. With 2 charging stops taking total of 0h 49m and a total cost of ₹1167, this trip achieves an efficiency of 7.6 km/kWh. %SoC remaining at the end of the trip was 59%.

Total Distance

556 km

Total Driving Time

11h 36m

Charging Summary
  • 🔌 Charging Stop 2 times
  • ⏱ Total Time 0h 49m
  • 💰 Total Cost ₹1,167.00
Efficiency

7.6 km/kWh

Final SoC

59%

Main Summary

EV Model:
Mahindra XEV 9e
Variant:
Mahindra XEV 9e Pack 3
Start Location:
Manesar, Gurugram, Haryana
Destination:
Dharamshala, Himachal Pradesh
Battery Capacity:
79 kWh
Start SoC:
96%
Travelers:
1
Boot Load:
15KG
Odometer:
13805 km
Temperature:
30°C
Departure:
5:34 AM, September 21, 2025
Photos:
Pit Stop Photo
Advertisement

Pit Summary

Location:
McDonald's, Gharaunda Toll Plaza, National Highway 1, Haryana 132114, India
Arrival Time:
8:02 AM, September 21, 2025
Arrival SoC:
67%
Odometer Reading:
13963 km
Kilometers Driven:
158 km
Time Driven:
2h 28m
Average Speed:
64.05 kmph
Driving Mode:
Default
AC Used:
Yes (26°C)
Current Ambient Temperature:
32°C
Regen Braking Level:
Auto
Charged Here:
Yes
Parameter Value
Brand Glida
Total Connectors 7
Charger Power 200 kW
Output Power 90 kW
Charging Time 00 Hour 22 Min
New Soc 92%
Unit Price ₹21
Total Cost ₹507
Departure Time:
8:24 AM, September 21, 2025
Total Pit Stop Time:
0h 22m
Brief Description:
Stopped at McDonals's for a quick breakfast and charged at Glida station.
Pit Stop Photos:
Pit Stop Photo
Pit Stop Photo
Pit Stop Photo

Location:
Bhure da Dhaba, Rupnagar, Naggal, Punjab 140113
Arrival Time:
12:47 PM, September 21, 2025
Arrival SoC:
56%
Odometer Reading:
14173 km
Kilometers Driven:
210 km
Time Driven:
4h 23m
Average Speed:
47.91 kmph
Driving Mode:
Default
AC Used:
Yes (26°C)
Current Ambient Temperature:
34°C
Regen Braking Level:
Auto
Charged Here:
Yes
Parameter Value
Brand Statiq
Total Connectors 2
Charger Power 120 kW
Output Power 90 kW
Charging Time 00 Hour 27 Min
New Soc 91%
Unit Price ₹20
Total Cost ₹660
Departure Time:
1:18 PM, September 21, 2025
Total Pit Stop Time:
0h 31m
Brief Description:
Stopped at Bhure da Dhaba for lunch and charged the car at the Statiq station during the stop.
Pit Stop Photos:
Pit Stop Photo
Pit Stop Photo
Pit Stop Photo
Pit Stop Photo
Pit Stop Photo
Advertisement

Destination

Final City:
Dharamshala, Himachal Pradesh
Arrival Time:
6:03 PM, September 21, 2025
Arrival SoC:
59%
Odometer Reading:
14361 km
Kilometers Driven:
188 km
Time Driven:
4h 45m
Average Speed:
39.58 kmph
Driving Mode:
Default
Ambient Temperature:
30°C
AC Used:
Yes (26°C)
Regen Braking Level:
Auto
Additional Photos:
Pit Stop Photo
Pit Stop Photo
View on Map View All Trips