Experience the electric journey of Aakash driving 867 kilometers from Valsad, Gujarat to Udaipur, Rajasthan in their Mahindra XUV400 EV on 7th August 2025. With 5 charging stops taking total of 4h 9m and ₹2372.2 in charging expenses, this trip highlights an efficiency of 7.58 km/kWh. %SoC remaining at the end of the trip was 21%.
867 km
18h 20m
7.58 km/kWh
21%
| Parameter | Value |
|---|---|
| Brand | Chargezone |
| Total Connectors | 2 |
| Charger Power | 60 kW |
| Output Power | 50 kW |
| Charging Time | 00 Hour 46 Min |
| New Soc | 92% |
| Unit Price | ₹21 |
| Total Cost | ₹585.65 |
| Parameter | Value |
|---|---|
| Brand | Go Charge |
| Total Connectors | 2 |
| Charger Power | 60 kW |
| Output Power | 42 kW |
| Charging Time | 00 Hour 53 Min |
| New Soc | 72% |
| Unit Price | ₹23.6 |
| Total Cost | ₹615.49 |
| Parameter | Value |
|---|---|
| Brand | Go Charge |
| Total Connectors | 2 |
| Charger Power | 60 kW |
| Output Power | 43 kW |
| Charging Time | 00 Hour 22 Min |
| New Soc | 46% |
| Unit Price | ₹23.6 |
| Total Cost | ₹277.06 |
| Parameter | Value |
|---|---|
| Brand | Torrent Power |
| Total Connectors | 2 |
| Charger Power | 60 kW |
| Output Power | 30 kW |
| Charging Time | 01 Hour 44 Min |
| New Soc | 100% |
| Unit Price | ₹12 |
| Total Cost | ₹487 |
| Parameter | Value |
|---|---|
| Brand | Charge Zone |
| Total Connectors | 2 |
| Charger Power | 60 kW |
| Output Power | 48 kW |
| Charging Time | 00 Hour 24 Min |
| New Soc | 72% |
| Unit Price | ₹21 |
| Total Cost | ₹407 |